Skip to content

DER Interconnection

DER Interconnection is an AI network planning tool from East-West Digital for distribution utilities. It brings application intake, simulation, compliance checks and reporting into one pipeline powered by AI, so planners clear connection queues faster.

Outcomes

60% shorter study cycle times, end to end

At least 75% less data intake time, on average

95%+ accuracy from the AI agents

The challenge

More applications than your engineers can study

Applications to connect distributed energy resources (DER) keep arriving, and each one passes through intake, data preparation, simulation, compliance checks and reporting, often in separate tools. Experienced engineers end up on administration, queues grow and evaluation timelines come under pressure.

What it does

  • Deadlines in view

    Dashboards and automated reporting help you avoid missing evaluation timelines.

  • Grid models stay local

    Localised scripts mean sensitive grid models are never uploaded to the cloud.

  • AI with deterministic checks

    AI agents work alongside deterministic methods to deliver compliant, optimised results.

  • Reports compiled for you

    Application data, simulation violations and mitigations come together in one report.

  • Experts back on engineering

    Freeing engineers from administrative tasks eases burnout and puts their expertise where it counts.

  • No new sensors

    DER Interconnection doesn't need direct hardware sensors on your network.

How it works

DER Interconnection replaces a chain of separate tools with one journey powered by AI. AI agents handle the repetitive work; your engineers review and decide.

  1. Step 1

    Take in applications

    AI agents process incoming generator applications and prepare the data and simulation models each study needs.

  2. Step 2

    Simulate inside your network

    Simulations run on localised scripts, so proprietary utility data and generator IP stay within your secure corporate network.

  3. Step 3

    Check compliance

    AI agents and deterministic checks evaluate the results against IEEE standards and your local grid code requirements, flagging any violations.

  4. Step 4

    Review and report

    A traceable impact study report brings together application data, violations and mitigations for engineers to sign off.

Use case · Customer scenario

Automated screening for high volumes of distributed generation

Automated screening of high volumes of distributed generation (DG) applications, through to full system impact studies.

For
Interconnection engineers
Standards
IEEE and local grid code
Data
Stays inside your network
  • Shorter queues

    The timeline from intake to approval speeds up, moving projects onto the grid in a fraction of the time.

  • Traceable logic

    Every assessment driven by AI is traceable and transparent, so engineers can audit and validate the logic with confidence.

  • Data privacy by design

    The hybrid architecture keeps proprietary utility data and generator IP inside the secure corporate network.

Who it's for

  • Interconnection engineers
  • Queue managers
  • System planning leaders
  • Distribution network planners

How to start

  1. 1

    Discovery

    We review your interconnection process, application volumes and planning tools to see where DER Interconnection fits.

  2. 2

    Pilot

    We run DER Interconnection on real applications alongside your team, so your engineers can check the results against their own judgement.

  3. 3

    Subscription

    The pipeline rolls out across your planning team, with dashboards tracking every application against its timeline.

Frequently asked questions

Do our grid models get uploaded to the cloud?

No. DER Interconnection runs on localised scripts, so sensitive grid models are not uploaded to the cloud. Its hybrid architecture keeps proprietary utility data and generator IP inside your secure corporate network.

Can our engineers see how the AI reached each result?

Yes. Every assessment in DER Interconnection is traceable and transparent, so engineers can audit and validate the logic. AI agents work alongside deterministic methods, and each report sets out the application data, simulation violations and mitigations behind the conclusion.

Which standards does DER Interconnection check against?

DER Interconnection evaluates simulation results against IEEE standards and your local grid code requirements. It covers the path from screening distributed generation (DG) applications through to full system impact studies.

Do we need to install sensors or new hardware on the network?

No. DER Interconnection doesn't require direct hardware sensors. It works from generator application data and simulation models, with simulations run on localised scripts.

How is DER Interconnection different from the Connection Assessment Tool?

DER Interconnection is built for distribution utilities handling high volumes of distributed generation applications, taking each one from intake to impact study report in a single pipeline. The Connection Assessment Tool (CAT) focuses on grid compliance assessment for new renewable connections, checking simulation results against Australian grid code criteria.

See DER Interconnection on your own data

Book a demo and we'll walk through your use case with our team.

Choose which cookies we can use. You can change this at any time on our privacy page.